종합열차운행제어의 병행 운전(교체) 방안에 관한 고찰

A Study on the Parallel Control(Change) at the Total Traffic Control

  • 김정수 (서울 메트로 1,2호선사령 종합관제센터) ;
  • 이재남 (서울메트로 종합관제센터) ;
  • 이기승 (서울메트로 종합관제센터) ;
  • 안현준 (삼성SDS SOC개발실)
  • 발행 : 2006.11.09

초록

The command of Subway is intended to adjust and control the train operation, and to play a key role of the total passenger transport and all kinds of affairs related to the safe train operation. Also, this can be considered as affairs to be controlled and operated by Total Traffic Control. For the purpose of developing the ATO system in using the new control technology by substituting the conventional ATS equipment, this technical document includes the technical points resulted from doing the replacement construction in the entire section of Subway Line 2 by Seoul Metro. The replacement work with the new ATO System should neither stop nor affect the system under operation while operating the current ATS System. The different systems should not interfere with each other while performing their individual affairs, and be composed to share the important data for the parallel operation. This technology is needed to proceed in assurance of a high degree of reliability.

키워드