서천터널 굴착 중 용출수 발생에 따른 터널 보수.보강 사례

A case study of sudden groundwater inundation in Seocheon Tunnel

  • 최혁 (현대산업개발 토목견적예산팀) ;
  • 김선곤 (현대산업개발 토목설계팀) ;
  • 김흥국 (현대산업개발 경춘선복선전철 제6공구) ;
  • 홍준표 (현대산업개발 경춘선복선전철 제6공구)
  • 발행 : 2006.11.09

초록

During excavation in seocheon tunnel, sudden groundwater inundation occurred in complex hydro-geological environments prevailing in underground tunnel. Large volumes of groundwater flowed into tunnel at STA 54km600. The authors have provided a comprehensive background to hydro-mechanics of groundwater with a geological analysis, ground investigation, hydro- mechanical modelling etc. To reinforce tunnel, we have applied the TAS grouting and the steel multi-layer grouting, and comfirmed the effects of reinforcement.

키워드