An Improvement Plan of Contract Price Adjustment through the Problem Analysis of the Current Price Escalation Regulation in Construction Projects

현행 건설공사 물가변동 제도의 문제점 분석을 통한 계약금액조정 개선방안

  • Published : 2006.11.11

Abstract

The purposes of study is to propose a new method contract price adjustment in construction projects. The research method of this study includes a case analysis and questionnaire survey. The results of this study are as follows: 1) For improvement method of contract amount adjustment, enactment for legislation pertaining to computation methods such as military's organization through total unit cost, and price flexibility computation at the point of design modification were presented. 2) Arithmetic formulas for cases in which volume is deleted or modified below the price flexibility exemption amount or in which there is no change to quantity, at the occurrence of design modification resulting from price flexibility, were proposed.

본 연구는 건설공사 불가변동으로 인한 계약금액조정을 함에 있어 산출과정에 있어서의 문제점과 물가변동 조정 후 설계변경이 수반될 때 물가상승액이 변경되면서 일어나는 비합리적인 정산방식과 법적인 문제점에 대한 개선방안을 제시하고자 수행되었다. 이를 위해 계약관리자를 대상으로 한 설문조사와 건설공사사례를 분석하였고 그 결과로 물가변동제도의 대한 문제점을 분석하였다. 위와 같은 과정을 통해 계약금액조정에 판한 개선방안 및 산식을 제안하였다. 상기와 같은 목적과 방법에 따라 수행된 본 연구의 결과는 다음과 같다. 1) 계약금액조정에 대한 개선방안으로는 합계단가로 비목군편성, 물가변동 조정 후 설계변경 수반시 증가된 물량 또는 신규품목에 대하여 설계변경당시 시점으로 물가변동 산출 등을 제시하였다. 2) 물가변동으로 인한 계약금액조정 후 설계변경이 수반될 경우 발생하는 기존물량 삭제 또는 물가변동제외금액 이하로 수량이 변경되는 경우와 수량 변경이 없는 경우에 대한 물가상승액 정산산식을 제안하였다.

Keywords