Improved Link System of Schedule and 3D Object for Visualizing Effective 4D Model on Plant Project

플랜트 4D의 효율적 공정연계체계를 위한 일정 및 도면의 개선된 연계방법론 구축

  • Published : 2006.11.11

Abstract

Existing 4D systems are using the 1:1 link system that directly links a schedule and a 3D model object. But considering that plant facility includes various kinds of schedule and 3D model object, this study suggests an improved link methodology of multi-selected objects and two-way link system for minimizing link errors which generated in case of multi-selected objects. For the link system, this study introduces a new concept called as interface board. Interface board can be used as an information center for representing all information of link items in the current project. It may be expected that 4D model can build an effective and rapid link system of plant project by this new approach.

기존의 4D시스템은 하나의 일정에 하나의 3D객체만을 연계하는 1:1링크체계를 활용하고 있으나, 방대한 수의 공정 및 3D Object를 가진 플랜트 시설의 특성을 고려하면 객체정보의 다중선택을 통한 일괄적인 링크체계를 구성할 필요가 있다. 이를 위해 본 연구에서는 플랜트 4D시스템 구축을 위한 개선된 일정 및 도면의 연계방법론으로서 다중객체의 표현방법론 및 양방향 연계방법론을 구성하였으며, 이를 위해 Interface Board 개념을 도입하였다. 즉, 현재 프로젝트에서 다중 링크되는 모든 항목들의 현황관리를 위한 별도의 전문화된 기능을 도입함으로서, 플랜트 4D시스템 구축의 개선된 링크방법론이 될 수 있고, 다중 링크과정에서 발생되는 각종 오류를 감소시킬 수 있을 것으로 기대된다.

Keywords