The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed)

작업성취율 측정을 위한 공정관리절차의 개선 방안

  • Published : 2006.11.11

Abstract

Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

LCI(Lean Constrcution Institute)에 의해 개발되어진 라스트 플래너(Last Planner System)은 Master Schedule, Phase Schedule, Lookahead Schedule, Weekly Work plan의 4단계로 이루어진다. 본 연구는 LSP의 4단계 중 Weekly Work Plan 단계에서 이루어지는 PPC(Percent of Plan Completed)의 측정 프로세스에 초점을 맞추고 있다. PPC 적용에 따른 여러 가지 장점에 대해서는 이미 해외 여러 나라에 의해 소개되어진 바 있지만, 아직까지 우리나라에서 PPC란 용어 자체가 낯선 상황이며, PPC 관련 연구가 미흡한 실정이다. 따라서, 본 연구는 한국 건설산업에 PPC를 도입하기에 앞서 라스트 플래너 시스템의 공정관리체계와 국내 공정관리체계를 비교 ${\cdot}$ 분석함으로써 우리나라 현실에 적합한 작업성취율 측정을 위한 공정관리절차를 제시하고 이를 도입하기 위해 선행되어져야할 사항에 대해 제시하고자 한다.

Keywords