Evaluation of Foundation Settlement of Gyungbu High Speed Concrete Track Under Construction

건설 중인 경부고속철도 콘크리트궤도 기초침하 평가

  • 김대상 (한국철도기술연구원, 궤도토목연구본부) ;
  • 유충현 (건설교통부 철도건설팀) ;
  • 김기환 (한국철도기술연구원, 궤도토목연구본부)
  • Published : 2007.11.08

Abstract

Foundation settlements(settlements at the embankment surface and ground) has been evaluating to satisfy the strict allowable residual settlement level from the start of the construction of Gyungbu high speed railway. This is because both embankment and ground settlement could be important to minimize the residual settlement after the construction of concrete track. Ground settlement is caused by the increase of effective stress resulting from embankment. The causes of embankment settlement could be come from different sources, for example, the increase of effective stress, rainfall, creep behaviors. Based on the field measured data, this paper analysed the settlement of ground and embankment settlement. The biggest settlement at the embankment surface was 9.7mm during 246days at the STA 000k922.5. The calculated settlement of embankment itself was 8.6mm at the same places. These results conclude that the compressive settlement of embankment could not negligible.

Keywords