The selection of RCM analysis system for efficient PM Tasks

효과적인 PM 업무를 위한 RCM분석대상 시스템의 선정

  • 김민호 ((주)마이크로트랙, RAMS 팀) ;
  • 송기태 ((주)마이크로트랙, RAMS 팀) ;
  • 백영구 ((주)마이크로트랙, RAMS 팀) ;
  • 이기서 (광운대학교 정보제어 공학과) ;
  • 윤화현 (서울특별시도시철도공사, 정비지원팀)
  • Published : 2007.11.08

Abstract

Most operational organization and railway authority which conduct scheduled maintenance(SM) have carried out the preventive maintenance(PM) based on the information provided from supplier and manufacturer of railway system. However these activities are far away from reality and low the efficiency, it is because an appropriate methods for system selection didn't take into account for improving maintenance efficiency. Therefore, the current SM tasks and maintenance activities lead to lots of spend on the cost and time. To solve the above problem, this thesis presents new approach methodology. This proposes the criteria for reliability centered maintenance(RCM) system selection through level of quantification of each parameter, i.e, frequency, severity and maintenance cost, etc. To do this, the field operation data and information of maintenance cost are essential. As applying this methodology, we can look forward to improving efficiency of PM/SM, and reducing cost.

Keywords