시스템 엔지니어링을 적용한 철도종합안전기술개발사업의 2차년도 성과물 검증 기준 및 결과

Verification specifications and results of the railway total safety technology development project adopting systems engineering

  • 한순우 (한국철도기술연구원 안전기술연구팀) ;
  • 윤혁진 (한국철도기술연구원 안전기술연구팀) ;
  • 신정무 (한국철도기술연구원 안전기술연구팀) ;
  • 김상암 (한국철도기술연구원 안전기술연구팀) ;
  • 조연옥 (한국철도기술연구원 안전기술연구팀)
  • 발행 : 2007.05.17

초록

To establish the national railway safety system, the railway total safety technology development project has been promoted by Ministry of Construction and Transportation (MOCT) since August 2004. The project is mainly focused on the prevention of a critical railway accident and the reduction of accident/mortality rate. To achieve its goal effectively, the project is composed of 15 sub-projects each of which can be categorized into three different technological area. This work deals with the verification results for the outcomes of the sub-projects carried out at the 2nd year of the project. A new verification procedure is developed and applied to the project based on the system engineering. Three criterions - The suitability of the realization of a function, the suitability of a physical structure, the suitability of a design analysis report - are used for the verifications. The verification results are investigated by calculating standard deviations of scores of each results.

키워드