Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects

공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안

  • 남용호 (서울시립대학교 건축학부) ;
  • 연희정 (서울시립대학교 대학원 건축공학과) ;
  • 홍태훈 (서울시립대학교 건축학부) ;
  • 구교진 (서울시립대학교 건축학부) ;
  • 현창택 (서울시립대학교 건축학부)
  • Published : 2007.11.09

Abstract

In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

현행 국내의 일괄입찰방식은 설계와 시공의 겸업금지로 공동도급 형태의 분담이행방식으로 운영되고 있어, 참여업체간의 의사소통 부족으로 인해 설계변경 클레임이 빈번하게 발생하고 있다. 또한 수행절차 과정에서도 사업참여자간 의견대립으로 인해 상호교류가 부족하여 프로젝트를 효율적으로 수행하는데 어려움이 있다. 이 연구에서는 일괄입찰방식, 파트너링과 시공성 분석의 특성을 파악하고, 예비적 고찰을 통한 상호교류의 영향도와 문제점을 분석하여, 일괄입찰방식 실시설계단계에서 프로젝트의 효과를 극대화 할 수 있는 효율적인 파트너링과 시공성 분석 연계 프로세스 모델을 제시하였다.

Keywords