International Symposium and Collaborative Study on Deep Cement Mixing, Okinawa 2009

2009 오키나와 Deep Mixing 심포지엄 및 공동연구

  • Published : 2008.03.28

Abstract

Quality Assurance of Deep Mixing to fulfill the requirements of geotechnical design cannot be achieved only by the process control During production conducted by the deep mixing contractor but it should involve relevant activities that are carried out prior to, during and after the construction by all the parties involved in a deep mixing project. The requirement is different for different application, and hence, QA/QC method/procedure and verification technique may be different for different application. In order to maintain the high quality of deep mixing work in the global market, it is necessary to conduct a research project, such as investigation of illustrations, the variety of existing QA/QC methods/procedures, the correlation between the outcomes of different QA/QC methods. In these reason, it has been held the international meeting to discuss them, in that kind of activities in 2009 it will be held Symposium. Also Collaborative study for QA/QC is on goin, and conduction by all participated members. The subject for collaborative study are, task 1 : investigation of laboratory tests procedures, task 2 : comparing of different laboratory tests procedures, task 3 : QA/QC method/procedures, task 4 : integrated Task1 ~task 3. The discussion of the results in all task will be held in the Symposium separately. In this paper, it was presented four tasks. Also the results in task 1 and 2 conducting domestically until now, such as investigation of laboratory test procedures, effect on the unconfined compressive strength by aging temperature and by delayed time.

Keywords