A Study on the generator Planning of GENCO in the competitive power markets

경쟁시장에서 발전업자의 발전설비계획에 관한 연구

  • Published : 2008.11.07

Abstract

The GENCO of competition in the market for profit maximization of business development for the study of how to build a facility plan. The total revenue for this thesis may be deducted from the total cost calculations and the cumulative profit, the result of cumulative profit through the profit and loss, and up to the turn-off to find a generator of canonicalization. Fortran, using a model to formally implement the program, and a graph that displays the results to build any power plants is the most efficient visibility of the eye can see.

Keywords