Economic Evaluation of Various Cooling Systems

냉방기기별 경제성 평가

  • Kim, Young-Il (School of Architecture, Seoul National University of Technology) ;
  • Cho, Keum-Nam (School of Mechanical Engineering, Sungkyunkwan University)
  • 김영일 (서울산업대학교 건축학부) ;
  • 조금남 (성균관대학교 기계공학부)
  • Published : 2008.06.25

Abstract

In this study, medium capacity EHP and GHP for air-conditioning a building with a floor area of $1,200\;m^2$ are compared economically. To consider all the factors of initial and operation costs effectively, an annual equal payment method is proposed. For the initial cost, equipment, construction, installation, electric facility, financial subsidy and tax cut are considered. Basic electricity, energy(electricity and gas), space charge, labor, insurance and repair are considered for the operation cost. Under the assumptions made in this study, overall cost of EHP is less than that of GHP. However, different outcome may result if different assumptions are made. This study is useful for performing an economic evaluation of various air-conditioning systems.

Keywords