Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling

친환경 리모델링 철거공사 프로세스 모델 개발

  • Published : 2008.11.07

Abstract

Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

리모델링 공사는 신축공사와 달리 철거공사가 주공정으로 선행되어야 하는데 현행 철거공사는 개략적 수준의 철거관리계획에 의한 생산성만을 강조한 철거 형태로 인해 폐자재 재활용이 되지 않고 있어 자원낭비, 환경파괴를 가중시키고 있으며, 철거작업 중 작업자의 안전과 구조체의 안전등이 전혀 고려되지 않고 철거하는 것이 현실이다. 따라서 친환경 철거공사가 되기 위해서는 프로세스의 개선이 우선 되어야하며 그 단계를 1) 철거관련 조사분석, 2) 철거관리 도서작성, 3) 철거관리 시공계획서작성, 4) 철거시공 및 감리, 5) 철거 후 관리의 5단계로 구분하였으며, 특히 철거도면 작성으로 표준철거 WBS가 구축되고, 철거장비 및 공법, 폐기물 투하, 철거공정계획 수립이 가능하며 마감재 철거 후 구조체의 안전점검을 실시하므로써 철거중 불가피한 보수보강이 가능하며, 철거완료 Check list 작성에 따라 리모델링 본 공사의 Database 활용이 가능하게 되었다. 본 논문에서는 현행 리모델링 철거공사 프로세스(AS-IS)의 문제점을 분석하고 개선된 친환경 리모델링 철거공사 프로세스(TO-BE)를 IDEF0 모델을 사용하여 제안하고자 한다.

Keywords