BIM based Integration Method of Cost and Schedule Information

BIM기반 비용.일정 통합관리 방안에 관한 연구

  • Published : 2008.11.07

Abstract

3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

공정과 공사비는 건설 프로젝트의 관리에 있어서 매우 중요한 두 가지 요소로써, 그동안 이들을 통합 관리하려는 노력이 많이 이루어져 왔으나 국내의 국가계약법에 따른 내역체계의 한계점과 내역 및 WBS 표준화 작업의 미흡으로 인해 실제 시행에 많은 어려움을 겪고 있다. 본 연구에서는 최신관리기법인 BIM의 객체기반 3D 모델링 정보를 이용하여 비용과 일정정보를 연계하여 관리하는 방안을 제시하였다. 먼저 프로젝트 구성정보를 비용, 일정, 구조물의 부위별 구성요소로 나누고 각 구성정보에 의한 분류체계의 특징을 분석하였고, 국내의 내역중심 관리체계와 전체적인 관리 시스템 상의 한계를 감안하여 제약조건을 절정하고 작업분류체계(WBS)를 통한 일정정보를 중심으로 비용과 3D 모델링의 부위별 객체들을 연계하는 방안을 제시하였다. 제시된 방안의 검증을 위하여 대림산업에서 시공중인 청풍대교 현장에 대하여 사례연구를 실시하였으며, 이를 통하여 일정변화에 따른 시각화 및 비용예측 등의 기대효과를 확인하고 한계점 및 향후 추가 연구사항들을 가늠해볼 수 있었다.

Keywords