A study on the Project Performance Measurement Baseline for Clients

발주자를 위한 프로젝트 성과측정기준선 설정 방안에 관한 연구

  • 고대준 (동의 대학원 건축공학과) ;
  • 최은아 (동의 대학원 건축공학과) ;
  • 박동진 (동의 대학원 건축공학과) ;
  • 이상범 (동의대 건축공학과)
  • Published : 2008.11.07

Abstract

The risk in the constructions projects is extremely diverse because there are too many indefinite factors. Therefore, Performance Measurement Baseline(PMB) is needed regularly during the construction process. However, nowdays, the PMB in the constructions projects is for contractors' PMB and Performance Management(PM). Clients have a lot of difficulties to control and manage the projects. Therefore, this paper classifies schedule and cost data of the public apartments houses which is a actual cases into types and then conducts regression analysis and deduces a regression. In addition to this paper establishes the Work Breakdown Structure(WBS) and suggests the PMB for the clients through using that.

건설프로젝트는 많은 불확정 요소로 인해 다양한 리스크를 가지고 있기 때문에 프로젝트 진행 과정에서 반복적인 성과측정은 중요하다. 그러나 현재 건설프로젝트에서 성과측정은 시공사 중심의 성과측정 및 성과관리가 이루어 져서 프로젝트의 진행상황에 따른 발주자의 능동적인 프로젝트 관리가 어렵다. 이에 본 연구에서는 실제 실행된 공공 아파트 건설공사의 공기 비용 데이터를 타입별로 분류하여 회귀분석을 실시하고 타입별 회귀식을 도출, 발주자 중심의 작업분류체계를 설정하고 이를 활용하여 이를 발주자 중심의 성과측정기준선을 제안방안을 제시하고자 한다.

Keywords