Abstract

Currently, the quality management, safety management and environment management of domestic construction work does not form a infrastructure for integrated control which have been developed according to the unique characteristics based on respective the law. In other words, the quality manager and safety manager of human resources is set to a legal arrangement personnel, but environment manager of human resources is not. In addition, quality management standard is to perform the work to PDCA(Plan-Do-Check-Action) system which is reflected in all of the requirements of KS A ISO 9001 standard, but safety management plan and hazard harmfulness prevention plan are not properly reflected P(Plan), C(Check) and A(Action) system and focusing on only 4 section Do(D) in KOSHA 18001 standard requirement. Moreover environmental management plan is not even established requirement. Through examining the operation practices of an advanced nation prior to building the integrated control standard for construction work qualify safety.environment, the possibility of applying domestic is reviewed, and then this study is going to research the operation practices of Singapore.

현재 국내의 건설공사 품질관리, 안전관리, 환경관리는 각각의 법령을 기반으로 고유특성에 맞게 발전되어와 통합을 위한 기반이 형성되어 있지 못하다. 즉, 인력에서는 품질관리자와 안전관리자를 법적 배치인력으로 정하고 있으나, 환경관리자는 법적 배치인력이 아니다. 또한 품질관리계획은 KS A ISO 9001 규격의 모든 요구사항이 반영되어 PDCA(계획-실행-체크-조치) 시스템으로 업무를 수행하도록 되어 있으나, 안전관리계획 및 유해 위험방지계획은 KOSHA 18001 규격 요구사항 중 4항 실행(D) 및 운영에만 치중되어 P(계획), C(체크) 및 A(조치) 시스템이 제대로 반영되어 있지 못하다. 더욱이 환경관리계획은 수립기준조차 마련되어 있지 못한 실정이다. 이에 건설공사 품질 안전 환경 통합관리 기준을 마련함에 앞서 해외의 건설공사 운영사례를 조사하여 국내 적용가능성을 검토하고자 하며 본고에서는 싱가폴의 건설공사 운영사례를 살펴보기로 한다.

Keywords