A Case Study Of Dynamic Compacted Rock Embankment Design Considering Long Term Behavior

장기침하를 고려한 고성토 암버력 동다짐 지반의 설계사례

  • Bae, Kyung-Tae (Institute of Construction Technology, DAEWOO Engineering & Construction Co. Ltd.) ;
  • An, Sang-Yik (Institute of Construction Technology, DAEWOO Engineering & Construction Co. Ltd.) ;
  • Park, Yong-Man (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
  • Kim, Kang-Kyu (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
  • Kim, Hyung-Suk (Kyungin Transmission & Distribution Construction Office, Korea Electric Power Corporation) ;
  • Lee, Woo-Jin (Dept. of Civil, Environmental and Architectural Engineering, KOREA Univ.)
  • Published : 2009.09.25

Abstract

In order to control differential settlement and to secure the safety of super structure on a high rock embankment the designed static compaction is changed with dynamic compaction and piled raft method. The parameters for dynamic compaction design are obtained from a pilot test. In addition, numerical analyses are also carried out to figure out the length and quantity of piled raft that can restraint the differential settlement within allowance range.

Keywords