궤도보수 작업 조건별 장대레일 축력변화에 관한 연구

A study on the Longitudinal Force Variation of CWR according to the Condition of Track Maintenance

  • 원용환 (한국철도공사 연구원 기술연구팀) ;
  • 김관형 (한국철도공사 연구원 기술연구팀) ;
  • 권순정 (한국철도공사 연구원 기술연구팀) ;
  • 이승열 (한국철도공사 연구원 기술연구팀)
  • 발행 : 2009.05.21

초록

This research presents the method to decide proper locations for destressing of CWR using a non-destructive equipments to measure the longitudinal force(installation temperature) in CWR. The effect and necessity of destressing were analyzed by estimating changes of longitudinal force. The installation temperature was measured to find changes of longitudinal force in high speed and conventional lines before and after destressing or track maintenance at the locations where destressing was planed or where change of longitudinal force was expected during track maintenance. Past destressing was carried out within qualitative decision criteria. This research proposes the quantitative criteria to decide the priority order of the destressing locations reasonably by considering the difference of air temperature and stress free temperature during the track maintenances, the grade of ballast resistance force recovering and the length of destressing, etc.

키워드