시공단계를 고려한 대단면 정거장 터널 안정성 해석

The stability analysis on large sectional tunnel station considering construction steps

  • 강은구 (태조엔지니어링 지반사업부) ;
  • 김양운 (태조엔지니어링 지반사업부) ;
  • 안경철 (태조엔지니어링 지반사업부) ;
  • 한명식 (태조엔지니어링)
  • 발행 : 2009.05.21

초록

Urban construction has numerous difficulties due to ground weakness and various complaints from third party, so it is not economically efficient and constructability is not favorable. Therefore, underground, which has good ground conditions, was used for construction field and facilities such as stations, and they are scaled up to enhance accommodation of facility limitation and function of stations. Large section tunnel station construction has numerous risk factors such as work boundary of excavation equipment, a relaxation of stress concentration, a safety plan of tunnel stability, and so on. Therefore, by using large section tunnel station stability analysis considering construction step, we expect to analyze the latent problem during construction, and to stabilize a future project plan of a large section structure design by using an auxiliary method and a support design.

키워드