경부고속철도 토공부에 대한 변형상태 계측 및 분석

Measurements and Analysis of Deformation States in Roadbed in Gyeongbu High Speed Railway

  • 진남희 (코레일테크 기업부설연구소) ;
  • 김남혁 (코레일 시설기술단 선로관리팀) ;
  • 심현우 (코레일테크 기업부설연구소)
  • 발행 : 2009.05.21

초록

The function of subgrade in the railway is to support track load on the subgrade as well as train load. Unlike the traditional railway, the uppermost subgrade layer in the Gyeongbu high speed railway was constructed as the reinforced road bed. The reinforced road bed comprises sub-ballast in the upper part and grade ballast in the lower part. The filling material such as soil and rocks in the subgrade can be settled by consolidation of original ground, compression due to self weight, plastic displacement due to train operation, and unequal settlement due to embankment material or improper compaction, therefore many efforts have been given for sufficient compaction and use of proper filling materials in the construction stage. The purpose of this study is to investigate the deformation state of subgrade in the Gyeongbu high speed railway. The investigation on the subgrade settlement was performed by choosing representative sections suspected to be settled based on the previous GPR test results and track maintenance history, measuring the settlement for some time period after installing settlement measuring instruments on and under the reinforced road bed. and analyzing the long-term subgrade settlement data from monitoring system which was installed at the construction stage of the high speed railway.

키워드