철도 공사의 효율적인 공정 관리를 위한 진도율 예측 기법 연구

A Study on Forecasting Method for Efficient Schedule Management in Railway Construction

  • 박진정 (국립경상대학교, 토목공학과) ;
  • 김현승 (국립경상대학교, 토목공학과) ;
  • 최광열 (국립경상대학교, 토목공학과) ;
  • 신민호 (한국철도기술연구원) ;
  • 강인석 (국립경상대학교, 토목공학과)
  • 발행 : 2010.06.10

초록

Measures on poor process should be identified by reviewing analysis of planned progress and actual progress for successful performance of Process Control. However, the existing Process Control only performances follow-up measures on poor process but it cannot prevent poor process which is not occurred. To solve these problems, this study suggests the three types of methods of process prediction(Regression Analysis) by using a progress rate which consists of planned progress rate and Actual progress rate.

키워드