A Study on ground behavior of shield TBM lunching area during xcavation

Shield TBM 발진부 굴착에 따른 지반거동에 관한 연구

  • 오태상 (서울시청 도시기반시설본부 도시철도설계부) ;
  • 김배식 (서울시청 도시기반시설본부 도시철도설계과) ;
  • 신한철 (서울시청 도시기반시설본부 도시철도국) ;
  • 김상환 (호서대학교)
  • Published : 2011.10.20

Abstract

This paper presents the ground behaviour of shield TBM lunching area during excavation. In order to perform this study, a scaled model test was carried out in the 1/45 scale for a field tunnel in practice where the tunnel had about 7.8 m diameter at Seoul Metro Line 9 construction site. The test to simulate earth pressure balance (EPB) shield TBM tunnelling at the lunching area was conducted with the developed small scaled shield TBM machine. Measurements were performed during simulation of excavation for total jacking thrust force, ground displacements and pressures. Based on the analysis of simulation results, the stability of ground was verified and evaluated. In particular, the suitable reinforcement range and methods are also suggested. In addition, these results are useful for engineers and technicians to select suitable and serviceable machine operation parameters and reduce environmental influence at all stages of tunnel construction.

Keywords