Evaluation of Plastic Accumulative Settlement of Embedded Rail Track by Real-scale Repetitive Load Tests

실대형 반복재하시험을 통한 매립형궤도 소성누적침하 평가

  • 이수형 (한국철도기술연구원, 신교통연구본부) ;
  • 강윤석 (한국철도기술연구원, 고속철도연구본부) ;
  • 오상호 (한국철도기술연구원, 고속철도연구본부) ;
  • 박정근 ((주)이알에스)
  • Published : 2011.10.20

Abstract

An active application of tram is being expected in Korea in the near future. For the tram operation in urban area, the embedded rail tracks where rails are completely embedded with pavements is required. When the embedded rail track is constructed on fine-grained subgrade soil, excessive cumulative plastic settlements due to repetitive tram road may occur. In this study, repetitive load tests were carried out to evaluate the accumulative plastic settlements of subgrade soils underneath embedded rail tracks. Two real-scale track specimens of 5 m lengths were constructed considering the maximum cant of a curved line. Repetitive tram loads of three million times were applied to the tracks in 5 Hz frequency. The accumulating patterns of plastic settlements were analyzed. Tram load distributing effects of the concrete slabs were also evaluated using the measured data of earth pressures cells that were installed underneath track. Also the measured settlements were compared with the estimated settlements calculated from an existing experimental equations, and its validity is discussed.

Keywords