Improvement of Constructability of Coping by Reduction of Reinforcement Amount

철근량 저감을 통한 코핑부 시공성 향상

  • 박봉식 (서울대학교, 건설환경공학부) ;
  • 박성현 (한국해양연구원, 연안개발에너지연구부) ;
  • 조재열 (서울대학교, 건설환경공학부)
  • Published : 2011.10.20

Abstract

Recently rapid construction of bridge is a main interest in construction. A research on rapid construction of pier coping is urgently needed because pier, which is a bridge understructure, directly affect lane reduction and increase of social cost. Precast assembly method and pre-assembly method are the main subjects of rapid construction. But these researches have focused not on reduction of reinforcement amount, but on modifying production method of coping. Reinforcement amount of design specification is as much as that of coping under constructing. So different approach is needed for reduction of reinforcement amount. In this paper, design of pier coping using strut-tie model was proposed for reduction of reinforcement amount and improvement of constructability. Railway bridge pier coping under constructing was analyzed using a finite element method and designed using strut-tie model.

Keywords