BIM-based Smart BOM by the Configuration Management of the Life-cycleconsidering the Railway Construction Project Management System and Method

BIM 기반/스마트 BOM의 형상관리에 의한 전 생명주기를 고려한 철도건설사업관리 시스템 및 방법에 관한 고찰

  • 정수영 (서울메트로 신사업본부 신사업본부) ;
  • 이종성 (서울메트로 신사업지원단) ;
  • 박수중 (서울메트로 철도사업처) ;
  • 이근영 (DDR소프트)
  • Published : 2011.10.20

Abstract

As the prefecture railroad construction accelerates, unmanned system's reliability and safety is increasing in demand. Accordingly, effective management of construction projects for the PM and SE techniques are being applied, with the introduction and use of PMIS computerized systems. Due to the construction of railways, from the start of PMIS research planning, design, procurement, to construction and commissioning, various expertise is being carefully gathered, and by integrating it into the unified budget ideas and processes, rational, efficient, organized, and manageable financial plans are developed for the computerized system. However, the current PMIS does not take into account the life-cycle. This study is to bring attention to the BIM smart BOM-based configuration management for life-cycle through the consideration for railway construction project management.

Keywords