A Study of Generator Excitation System for first Power Supply to gird line

가스터빈 시송전 발전기 여자시스템에 관한 연구

  • Published : 2011.07.20

Abstract

We performed commissioning of redundant digital excitation system for gas turbine generator. One of its issues is first power supply test to gird line when it was compared with the other commissioning. If blackout will be happened, a few of start power plants must supply power to grid line. And then generator must increase voltage and real power slowly for line charge. The trial product was installed and successfully operated at a 100MW power plant after commissioning.

Keywords