Determination of the HESS Capacity for Mitigation of Fluctuation of Wind Farm Output under Consideration of Disconnecting Wind Farm

풍력발전단지 탈락 시를 고려한 단지 출력 변동 저감을 위한 HESS의 용량 산정

  • Kim, SeongHyun (Department of Electrical Engineering, Jeju National University) ;
  • Ko, JiHan (Multidisciplinary Graduate School Program for Wind Energy, Jeju National University) ;
  • Kim, Eel-Hwan (Department of Electrical Engineering, Jeju National University)
  • 김승현 (제주대학교 전기공학과) ;
  • 고지한 (제주대학교 풍력특성화협동과정) ;
  • 김일환 (제주대학교 전기공학과)
  • Published : 2013.07.02

Abstract

This paper presents the method for the fluctuation smoothing control by using relaxation time variable control of battery. When the output power of wind farm is changed suddenly, it is necessary to control the output power of wind farm. The smoothing relaxation time is changed within limits of battery output power. Using the hybrid energy storage system (HESS) combined with battery energy storage system and electric double layer capacitor, it is possible to control the output power of wind farm. The capacity of battery is determined by considering the case of the disconnecting wind farm from the grid. To verify the proposed method, simulations are carried out by using PSCAD/EMTDC with actual data of wind farm in the Jeju Island.

Keywords