Proposal for CVAP of First Plant of APR+ NPP

APR+원전 최초 호기의 CVAP 수행에 대한 제언

  • Published : 2014.10.29

Abstract

The comprehensive vibration assessment program(CVAP) of APR+ nuclear power plant(NPP) is classified as non-prototype, category II with Palo Verde NPP as valid prototype. In this paper, CVAP for first plant of APR+ NPP is proposed. The Control Element Assembly(CEA) shroud of APR+ NPP is different from that of Palo Verde NPP. And the Core Support Barrel(CSB) outer diameter and the flow rate of normal operation of APR+ NPP are larger than those of Palo Verde NPP. Vibration and stress analysis program should be conducted to establish test acceptance criteria. Limited vibration measurement program should be implemented to establish the margin of safety, demonstrate the satisfaction of test acceptance criteria and confirm the similar vibratory response between the APR+ and Palo Verde NPP. Because of the change of normal operation condition, the nominal differences between APR+ and Palo Verde NPP in the structural and hydraulic analysis are studied to determine the measurement locations.

Keywords