Engineering design procedure for gas turbine combined cycle power plant with post-combustion CO2 capture

CO2 포집을 고려한 가스터빈 복합화력 발전 플랜트의 시스템 대안 평가를 위한 공학 설계

  • Published : 2014.11.27

Abstract

As the user demand for power plants becomes various, design objective becomes complicated. To review the system feasibility, system objective and evaluation criteria need to be newly defined. In this study, engineering design procedure of the multi-purpose power plant, such as barge-mounted combined cycle power plant with $CO_2$ capture, was shown as a previous work for the feasibility review of the system alternatives. For the system design, heat and mass balance for each system configuration was firstly performed. Using the thermal analysis results, conceptual design of system alternatives was carried out. And then, preliminary design of the major equipment was done. The engineering calculation results of this study would be used as the evaluation data for system feasibility review.

Keywords