Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction

모듈러 건축공사의 조달 및 양중 효율화를 위한 중점개선 요구사항 도출

  • 김민주 (고려대학교 건축사회환경공학과) ;
  • 이동민 (고려대학교 건축사회환경공학과) ;
  • 임현수 (고려대학교 건축사회환경공학과) ;
  • 조훈희 (고려대학교 건축사회환경공학과) ;
  • 강경인 (고려대학교 건축사회환경공학과)
  • Published : 2015.05.28

Abstract

Procurement and lifting scheduling of modules and resources in modular construction, where modules that are manufactured from factory are delivered and assembled on site, is a crucial factor that determines the efficiency of the whole construction. However, previous studies have barely acknowledged the significance of resource procurement process and lifting of modules in modular construction. Therefore, this research aims to derive factors that are in need of improvement for successful implementation of procurement and lifting efficiency, and visualize them according to their importance and performance on improvement through IPA(Important Performance Analysis).