Determination of BTB HVDC Operating Point in Metropolitan area

대도시 내 BTB HVDC 투입 시 운전점 결정 방안

  • Published : 2015.07.15

Abstract

Since $20^{th}$ century, along with the rapid industrial advancement, the concentrated urban development in specific large cities have made people migrate to those cities, thus causing problems in the power system stability. In case of Korea, more than 40% of the power system demand comes from the consumers in Seoul Metropolitan area and the rate is expected to increase. With the continuous increase of power demand, in order to meet the demand for system reliability improvement, the power system was multi-looped for reliability enhancement, the problem of fault current happened. In this situation, there are several methods for fault current reduction likes current limiting reactor, replacing circuit breaker, splitting busses, etc. But these methods reached its limit, power system needs more fundamental solutions such as grid segmentation. In this paper, we assume grid segmentation already has been progressed using VSC BTB HVDC. Then, this paper discusses operating point of HVDC in metropolitan area considering loss minimization and handy flow control. The simulation is proceeded on 2027 KEPCO system.

Keywords