보-기둥구조 PC공동주택 시공관리를 위한 골조공사 ADM공정표 작성

Writing ADM Network Diagram of Frame Work for the Precast Concrete Public Apartment Building Construction Management

  • 발행 : 2022.11.10

초록

In this study, the work flow of the construction process was analyzed based on construction monitoring for a building of the middle size beam-column system Precast Concrete(PC) apartment building supplied by LH, and the Arrow Daigram Method(ADM) network diagram of its construction was written. The results of this study are judged to be able to improve productivity by using the PC structure apartment building construction plan to calculate a reasonable construction period and prepare a process management method for the PC structure frame construction.