간척지에서 두더지 암반설치법과 제감효과에 관한 연구

An Experiment for the Lay out Method of Mole Drains and the Effect of Desalinization in Reclaimed Tidelands.

  • 발행 : 1969.12.01

초록

The newly designed mole drainage plower which is attached to tractor is tested for work capacity comparing with the pulling by man animal and winch. Besides. the effect of desalinization by the mole drainage in reclaimed tideland was observed. The results as obtained in this experiment are as follows: 1. The mole drainage plower of tractor attachment has higher work capacity by 3 to 5 times than that of winch 2. The suitable soil moisture content to carry out the layout of mole drains is from 21 to 25 percent. 3. The new design mole drainage plower requires th lowest cost as comparing with the other methods. 4. Carrying out the mole drainage in reclaimed tideland it is effective in desalinization from 2 to 3 times than the only use of irrigation water. 5. The reasonable depth and interval of mole drains may be 60cm and 3m respectively. 6. The desalinization by the mole drainage increases the yield of rice from 40 to 45 percent in reclaimed tideland.

키워드