A Study of Automation for Examination Analysis of Inservice Inspection for Nuclear Power Plant (I)

원자력발전소(原子力發電所) 가동중(稼動中) 검사(檢査)의 시험분석(試驗分析)을 위한 자동화연구(自動化硏究) (I)

  • 김욱 (한국검사개발주식회사)
  • Published : 1985.11.08

Abstract

The developing country, KOREA where does not possess the natural resources for traditional energy such as oil and gas, so. The nuclear energy is the most single reliable source available for closing the energy gap. For these reason, It is inavoidable to construct the nuclear power plant and to develop technology related nuclear energy. The rate of operation in large nuclear power facilities depends upon the performance of work system through design and construction, and also the applied technology. Especially, it is the most important element that safety and reliability in operation of nuclear power plant. In view of this aspects, Nuclear power plant is performed severe examinations during preservice and inservice inspection. This study provide an automation of analysis for volumetric examination which is required to nuclear power plant components. It is composed as follows: I. Introduction II. Inservice Inspection of Nuclear Power Plant ${\ast}$ General Requirement. ${\ast}$ Principle and Methods of Ultrasonic Test. ${\ast}$ Study of Flaw Evaluation and Design of Classifying Formula for Flaws. III. Design of Automation for Flaw Evaluation. IV. An Example V. Conclusion In this theory, It is classifying the flaws, the formula of classifying flaws and the design of automation that is the main important point. As motioned the above, Owing to such as automatic design, more time could be allocated to practical test than that of evaluation of defects, Protecting against subjective bias tester by himself and miscalculation by dint of various process of computation. For the more, adopting this method would be used to more retaining for many test data and comparative evaluating during successive inspection intervals. Inspite of limitation for testing method and required application to test components, it provide useful application to flow evaluation for volumetric examination. Owing to the characteristics of nuclear power plant that is highly skill intensive industry and has huze system, the more notice should be concentrated as follows. Establishing rational operation plan, developing various technology, and making the newly designed system for undeveloped sector.

Keywords