종속적(從屬的)인 준비시간을 갖는 다단계공정(多段階工程)에서의 그룹스케듈링 해법(解法)

Multi-Stage Group Scheduling with Dependent Setup Time

  • 송영우 (한양대학교 공과대학 산업공학과) ;
  • 노인규 (한양대학교 공과대학 산업공학과) ;
  • 김만식 (한양대학교 공과대학 산업공학과)
  • 발행 : 1985.12.31

초록

The application of GT results in the mass production effect to multi-product, small lot-sized production. Group scheduling, which is operations scheduling based on the GT concept, is analyzed in a multistage manufacturing system. But the research has been limited in independent setup time models. A heuristic algorithm has been developed to minimize the mean flow time when setup times are dependent to sequence of group in multistage. For evaluation of the heuristic algorithm, the solution of heuristic algorithm is compared with that of random scheduling. The result of comparison indicates that the proposed heuristic algorithm provides good solutions with relatively fewer computational effort.