워크샘플링(Work Sampling)에 의한 병원급식의 작업측정 사례연구

A Case Study on the Work Measurement of Hospital Foodservice by the Work Sampling Methodology

  • 차진아 (연세대학교 생활과학대학 식품영양학과)
  • 발행 : 1991.12.01

초록

The purposes of this study were to : a)determine the percentage of labor activities expen-ded in various work functionsof hospital foodservice b)estimate the labor time utilized in each work functions c)investigate the overall work patterns of hospital foodservice and d)provide the basic data for effective labor control This study was conducted in two hospitals with 1300 and 1200 ed capacities and every employees of the dietary department were included in 10days work measurement. Work sampling methodology developed by Donaldson and Ostenso was modified and used for observing overall activities of hospital dietary department. Consistency of data and observa-tion period were verified by 3$\delta$ control chart and control chart. Observed data were satisfied with confidence level of 95% and confidence interval of $\pm$0.05, The results of this study were as follows: 1) The direct work function indirect work function and delay were 74.8%, 9.2%, 16.0% respectively with A hospital and 82.2% 7.2%, 10.6% respectively with B hospital 2) The productivity indices of direct work indirect work and delay were 9.05 min/meal 1.12 min/meal 1.94 min/meal respectively and total 12.11 minutes were utilized per meal served in A hospital and 10.72 min/meal 0.94 min/meal 1.38 min/meal respectively and total 13.04 minutes were utilized per meal served in B hospital 3) Full time equivalent(FTE) utilized in daily work of irect work indirect work and delay were 62.24 men 7.69 men 13.35 men respectively in A hospital and 64.09 men 5.63 men 8.22 men respectively in B hospital. 4) The contents of work activities of each employee group showed that delay time of the service personnel group was more than any other employee groups in both A hospital and B hospital 5) Examination of daily work schedule by time intervals showed that transportation work function was carried out all day so it is necessary to improve this work.

키워드