Explosives and Blasting (화약ㆍ발파)
- Volume 9 Issue 2
- /
- Pages.13-18
- /
- 1991
- /
- 1229-9073(pISSN)
Tunneling project of Oil Storage in Underground Base
지하 원유 저장기지 터널굴착공사
Abstract
It was described Several Tuneling method for applying petrolum oil storage. The most Important factor of Tunneling is not only reinforcing works such as pre-grouting and after grouting but also rock bolting and shotcrete. The efficent works should be done by professional skillman, and also the classification of rock should be decided by professional engineers.
Keywords