Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA

환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구

  • Published : 1994.06.30

Abstract

Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

Keywords