A Study on the Due-date Estimation for Some Computerized Manufacturing Systems

전산화된 공장에서의 납기결정 방안에 관한 연구

  • 김재만 (고려대학교 산업공학과) ;
  • 김성식 (고려대학교 산업공학과)
  • Published : 1995.08.01

Abstract

In manfacturing systems, to overcome the inherent complexities and uncertainties, due-dates are usually decided by some simple rules. This study proposes a computational procedure for estimating production lead time for computerized manufacturing systems. Based on the current system status stored in the computers, the procedure estimates production lead time for an incoming order. The result is more accurate than the ones produced by old rules, and yet the procedure is fast in computation speed enough to use in real time. Simulations are used to prove these.

Keywords

References

  1. Management Science v.30 no.9 Sequencing rules and due-date assignments in a job shop Baker,K.R.
  2. AIIE Transactions v.13 no.2 A comparison of due-date selection rules Baker,K.R.;Bertrand,J.W.M.
  3. Management Science v.29 no.10 Mathematical programming approach to capacity-constrained MRP system: Review, formulation and problem reduetion Billington,P.J.;Mclain,J.O.Thomas,L.J.
  4. International Journal of Production Research v.24 no.3 Optimal due-date as-signment in a job shop Cheng,T.C.E.
  5. Survey of scheduling research involving duedate determination decisions v.38 Cheng,R.C.E;Gupta,M.C.
  6. International Journal of Production Research v.14 no.2 Due-dates in job shop scheduling Elion,S.;Chowdhury,I.G.
  7. IIE Transactions v.21 no.2 Due date assignment in a multistage job shop Fry.T.D.;Philipoom,P.R.;Markland,R.E.
  8. European Journal of Operational Research v.40 Production planning system and their applicability to make-to-order companies Hendry,L.C.;Kingsman,B.G.
  9. Journal of Manufacturing Systems v.10 no.1 A due-date assignment model for a flow shop with application in a lightguide cable shop Rajasekera,J.R.;Murr,M.R.;So,K.C.
  10. Manufacturing Planning and Control Systems(2nd ed.) Vollmann,T.E.;Berry,W.L.;Whybark,D.C.
  11. Management Science v.37 no.7 Due-date setting and priority sequencing in a multiclass M/G/1 queue Wein,L.M.
  12. Managent Science v.38 no.7 A broader view of the job-shop scheduling problem Wein,L.M;Chevalier,P.B.