Implementation of DYLAM-3 to Core Uncovery Frequency Estimation in Mid-Loop Operation

  • 발행 : 1998.12.01

초록

The DYLAM-3 code which overcomes the limitation of event tree/fault tree was applied to LOOP (Loss of Off-site Power) in the mid-loop operation employing HEPs (Human Error Probabilities) supplied by the ASEP (Accident Sequence Evaluation Program) and the SEPLOT (Systematic Evaluation Procedure for Low power/shutdown Operation Task) procedure in this study. Thus the time history of core uncovery frequency during the mid-loop operation was obtained. The sensitivity calculations in the operator's actions to prevent core uncovery under LOOP in the mid-loop operation were carried out. The analysis using the time dependent HEP was performed on the primary feed & bleed which has the most significant effect on core uncovery frequency. As the result, the increment of frequency is shown after 200 minutes duration of simulation conditions. This signifies the possibility of increment in risk after 200 minutes. The primary feed & bleed showed the greatest impact on core uncovery frequency and the recovery of the SCS (Shutdown Cooling System) showed the least impact. Therefore the efforts should be taken on the primary feed & bleed to reduce the core uncovery frequency in the mid-loop operation. And the capability of DYLAM-3 in applying to the time dependent concerns could be demonstrated.

키워드

참고문헌

  1. RESS v.22 Accident Sequence Dynamic Simulation versus Event Trees A.Amendola
  2. EUR 15265 EN DYLAM-3 A Dynamic Methodology for Reliability Analysis and Consequences Evaluation in Industrial Plants G.Cojazzi;P.C.Cacciabue;P.Parisi
  3. EUR 15266 EN The DYLAM Approach for the Reliability Analysis of System with Dynamic Interactions G.Cojazzi;P.C.Cacciabue
  4. KAERI/TR-750/96 Probability Safety Assessment on Loss of Offsite Power During Mid-Loop Operation of PWR T.S.Sung
  5. Proceeding of the KNS 97 spring meeting v.1 Development of a Human Error Evaluation Methodology for LP&S Operation Tasks-SEPLOT Y.I.Kim;C.H.Chung;M.S.Jae
  6. NUREG/CR-6144 v.2 Evaluation of Potential Severe Accidents During Low Power and Shutdown Operations at Surry, Unit 1
  7. KAERI/TR-452/94 Current Status of Low Power/Shutdown PSA and Accident Sequence Analysis for Loss of RHR During Mid-Loop Operation Y. Choi
  8. Operation Procedure for YGN3&4 KEPCO
  9. Computational Methods in Reactor Shielding J.Wood
  10. Nuclear Power Reactor Safety E.E.Lewis
  11. Expanding the scope of DYLAM methodology to study the dynamic reliability of complex systems : the case of Chemical and Volume Control in nuclear power plants P.C.Cacciabue;A.Carpignano;C.Vivalda
  12. Nuclear Technology v.74 Dynamic Logical Analytical Methodology versus Fault Tree : The Case Study of The Auxiliary Feedwater System of a Nuclear Power Plant P.C.Cacciabue;A.Amendola;G.Cojazzi
  13. FSAR for YGN3&4 KEPCO
  14. Int.J.Man-Machine Studies Modelling operators in accident conditions : advances and perspectives on a cognitive model A.Amendola;U.Bernsini;P.C.Cacciabue;G.Mancini