The Stability Evaluation Methods of Embankment on Soft Clay

연약지반 성토의 안정평가 방법

  • Kang, Yea Mook (Dept. of Agricultural Engineering, College of Agriculture, Chungnam National University) ;
  • Lee, Dal Won (Dept. of Agricultural Engineering, College of Agriculture, Chungnam National University) ;
  • Kim, Ji Hoon (Dept. of Agricultural Engineering, College of Agriculture, Chungnam National University) ;
  • Kim, Tae Woo (Dept. of Agricultural Engineering, College of Agriculture, Chungnam National University) ;
  • Lim, Seong Hun (Dept. of Agricultural Engineering, College of Agriculture, Chungnam National University)
  • 강예묵 (충남대학교 농과대학 농공학과) ;
  • 이달원 (충남대학교 농과대학 농공학과) ;
  • 김지훈 (충남대학교 농과대학 농공학과) ;
  • 김태우 (충남대학교 농과대학 농공학과) ;
  • 임성훈 (충남대학교 농과대학 농공학과)
  • Published : 1998.12.30

Abstract

The field tests were performed to suggest the rational method for stability evaluation of soft clay. The behavior of settlement-displacement obtained by field monitoring system was to compare and analyze the results of the observationed method, and to investigate the complex behavior of soft clay with filling height. The results of this study are summarized as follows. 1. The horizontal displacement was suddenly increased when physical properties of soft clay showed maximum values and the part of the turning point. The values of these properties were available to the fundamental data for stability evaluation. The shear deformation appeared that difference of the horizontal displacement was maximum values. 2. Although the stability of embankment by step filling showed the unstable part over the failure standard line, the embankment was confirmed stable. So the evaluation of the stability of embankment is reasonable to use the inclination of curve than failure standard line. 3. The horizontal displacement and relative settlement were increased as same ratio at improvement ground. Estimation of shear deformation using Terzaghi's modified bearing capacity should consider the relations of embankment load and undrained shear strength at nonimprovement ground, and minimum safety factor is recommended to use larger than 1.2. 4. Excess pore water pressure was increased with increasing of filling height and decreased with maintain the filling height. The embankment was unstable when filling height was exceed the evaluation standard line, and the behavior of excess pore water pressure and horizontal displacement could use as a standard of judgement of the filling velocity control because their behavior were agree with each other.

본 연구는 합리적인 침하계측관리의 수립을 위하여 현재 시공중인 사업부지를 선정하여 연약지반에 성토시 안정성에 미치는 영향을 현장계측결과를 기초로 기존의 안정평가 방법등과 비교분석하여 성토에 따른 지반의 복합적인 거동을 구명하고 연약지반의 안정평가 기법을 제시하고자 한 것으로 연구결과를 요약하면 다음과 같다. 1. 물리적 성질이 심도별로 최대치를 나타내며 변곡점이 형성되는 부분에서 수평변위가 급증하여 위험가능성이 있으므로 안정관리분석시 기초자료로 이용할 수 있고, 수평변위량의 차가 가장 큰 부분에서 전단변형이 발생되었다. 2. 단계성토에 따른 계측자료를 이용하여 성토체의 안정성을 비교분석 한 결과, 파괴기준선을 초과하여 위험치에 접근하는 부분도 있었으나 성토체는 안정한 것으로 확인되어 안정관리상 파괴기준선으로 안정성을 판단하는 것보다는 곡선의 기울기로 판단하는 것이 합리적이라고 판단된다. 3. 처리지반에서의 수평변위와 상대침하량은 거의 같은 비율을 유지하면서 증가하며, 무처리 지반에서 Terzaghi 수정지지력을 사용할 경우의 전단변형은 성토하중과 비배수 전단강도와의 관계를 고려하고 안전율은 1.2보다 큰 값을 사용하여야 할 것으로 판단된다. 4. 과잉간극수압은 성토시공높이에 따라 상승되고 방치기간에 따라서 감소되며, 성토높이가 관리기준치를 초과하면 과잉간극수압은 급격하게 증가되어 불안정한 상태가 되고 과잉간극수압과 수평변위량의 움직임은 거의 일치하고 있으므로 성토의 시공속도를 조절하는데 판단기준으로 이용할 수 있다.