A Case History of Confinement of the Contaminated Landfill Using a Vortical Barrier

연직 차수벽을 이용한 폐기물매립지 침출수 오염 제어 사례 연구

  • 이재영 (서울시립대학교 환경공학부) ;
  • 정문경 (한국건설기술연구원 토목연구부) ;
  • 고재만 (㈜일광 지오라인, 기술연구소)
  • Published : 1999.09.01

Abstract

This paper presents a case history of remedial action adopted for contaminated groundwater in a landfill. The objectives of the projects are : (1) to effectively confine contaminated groundwater with an economically reasonable means, (2) to prevent further contamination of soil by collecting and treat the contaminant. and (3) to assure the environmental safety of the landfill during its operating period. Reported are the process from site investigation, through design and construction of an appropriate remedial action, to the monitoring of the selected confinement system. In view of the results of site investigation, deep soil mixing cutoff wall using the DMW(deep soil mixing cutoff wall) method and specially produced HEC soil stabilizer were used for the construction of deep soil mixing cutoff wall. For rock foundation with sever fractures, chemical grout curtain with urethane was installed. The monitoring results to date indicate that the selected vertical barrier performed satisfactorily.

본 논문은 매립지의 침출수 유출로 오염된 지반 및 지하수의 효과적인 처리 방법 중의 하나인 연직 차수벽의 시공사례를 다루고 있다. 연직 차수벽의 설치 목적은 오염된 지하수의 이동을 경제적이고 효과적으로 차단하고, 차단후 차수벽 내부의 오염된 지하수를 회수하여 침출수 처리장에서 처리함으로써 추가적인 지반오염을 방지하며, 매립장의 잔여 이용 기간동안 매립장의 안전 운영의 기초를 확보하는 것이다. 현장조사의 단계에서 부터, 공법의 선정과 설계, 시공. 시공품질의 확인에 까지 일련의 과정을 보고하였다. 오염원과 오염의 원인 및 범위를 파악한 후, DMW공법과 HEC고화제를 이용하여 심층 혼합 차수층을 설치하였다. 균열이 심한 암반층의 차수를 위해서는 우레탄을 주입하여 차수층을 형성하였다. 조사기간 동안의 현장 모니터링 결과에 의하면, 토사와 암반층에 걸친 심층 혼합 차수층의 설치로 본 현장의 오염 처리는 현재를 기준으로 만족스러운 것으로 판단되었다.

Keywords