건축설비시설의 갱신을 위한 최적 대체안 선정모델 개발에 관한 연구

A Study on the Development of Optimal Alternative Selection Model to Renew Building Equipments System

  • 발행 : 2000.10.01

초록

The objective of this study is to develop optimal alternative selection model for renewing building equipments system. Cost Breakdown Structure of LCC in HVAC systems are deduced from resonable data and factors. As for Cost Breakdown Structure of LCC in HVAC system, pertinent level, title, CBS number, and block number are determined efficiently. Especially, in addition to current cost factor, it is possible to make Cost Breakdown Structure using present worth method more clear. A model of POWER LCC ver 1.0 used to analyze primary cooling system, heating system, and air conditioning system are POWER LCC ver 1.0_/sub SYSTEM/ : C1+ C2- C3+ C4+ C5+ C6+ C7±C8+ C9- C10/sub -1/+ C10/sub -2/+ C10/sub -3/, and is implemented with consideration of Cost Breakdown Structure and their summation using present-worth method. It is programmed with one of scientific languages, MATLAB 5.3.

키워드

참고문헌

  1. A Study on Renewal Evaluation of Building Equipment System by AHP (Analytic Hierarchy Process) Kim, D. W.
  2. Journal of the KIBS v.2 no.4 A Study on the Criteria of Cost Breakdown Structure of HVAC system for Life Cycle Cost Analysis Jung, S. S.;Yee, J. J.
  3. Chartered Quantity Surveyor v.6(2) Life Cycle Costing in the USA Law, A.
  4. Proceedings of 4th International Symposium on Building Economics v.A The Evaluation of Life Cycle Costing as a Practical Tool During Building Design Ashworth, A.;Au-Yeung, P.