A Project Delivery System Selection Model for Large Public Construction Projects

대형 공공공사의 적정 발주방식 선정모델

  • 현창택 (서울시립대학교 건축공학과) ;
  • 서용칠 (서울시립대학교 대학원 건축공학과) ;
  • 이인근 (서울특별시 기술심사담당) ;
  • 유길상 (서울특별시 기술심사담당) ;
  • 이승석 (서울특별시 기술심사담당)
  • Published : 2000.06.01

Abstract

Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

발주방식은 프로젝트 참여자들의 관계, 역할, 의무 등을 정하는 것으로, 프로젝트를 성공적으로 수행하기 위해서는 적정 발주 방식을 선정하여 적용하여야 한다. 현재까지 국내에서는 주로 설계시공분리방식에 의해 대형공공공사를 수행해 왔지만, 정부에서는 일괄입찰이나 대안입찰방식을 점차 확대하려는 정책을 추진하고 있다. 그러나 발주방식은 정책에 의해 결정하기보다는 사업목적 당해 프로젝트의 물리적인 특성, 사업수행환경 등을 종합적으로 고려하여 결정하여야 한다. 본 연구에서는 사업결과에 상당한 영향을 미치는 적정 발주방식을 결정하기 위한 객관적인 발주방식 선정기준과 더불어 정량적으로 발주방식별 성능을 비교ㆍ평가할 수 있는 적정 발주방식 선정절차모델을 제안하였다. 발주방식 선정기준은 프로젝트 특성, 발주자 특성, 사업수행환경으로 구성되어 있으며, 발주방식 선정모델은 발주방식 선정 체크리스트, 발주방식 선정 매트릭스, 발주방식의 적정성 판단의 3단계로 구성되어 있다.

Keywords