유기물자원화 (Journal of the Korea Organic Resources Recycling Association)
- 제8권2호
- /
- Pages.77-84
- /
- 2000
- /
- 1225-6498(pISSN)
- /
- 2508-3015(eISSN)
1톤/일 처리규모의 하수슬러지 퇴비화 실증운전
Operation of Sewage Sludge Composting Plant(Capacity of 1 ton/day)
- Joung, Kyong-Chul (Hyudai Institute of Consouction Technology) ;
- Kwak, No-Hyuk (Hyudai Institute of Consouction Technology) ;
- Park, Sung-Hee (Hyudai Institute of Consouction Technology) ;
- Phae, Jae-Kuen (Dep. of Environmental Engineering, Seoul National Poly Tech University)
- 투고 : 2000.04.28
- 심사 : 2000.05.22
- 발행 : 2000.06.30
초록
연속운전을 실시한 결과 전반적으로 발효 1단에서 발효 2단보다 온도가 높은 경향을 보여주었고 운전기간동안 발효 1단
Aim to get operation factors, an In-vessel Composting of Wastewater Sludge was operated. The composting equipment is consisted of three chamber, 1st, 2nd and 3rd consequently. In the results, the temperature of fermentation had shown that 1st fermentation chamber(F/C) temperature was higher than that of 2nd and 3rd fermentation chamber. The temperature was steady in all steps during the sludge being composted, the ranges of each step were