A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction-

고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로-

  • Published : 2001.12.01

Abstract

Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.

초고층 공사의 다양한 공정들을 정해진 시간내에 효율적으로 관리하기 위해서 최근 자재의 생산에서부터 현장반입, 설치에 이르는 자재 생애주기별 관리를 시스템화하고, 정보화하는 작업들이 많이 이루어지고 있다. 이러한 건설공사에서의 자재 적시생산 개념은 초고층평면의 다양화 및 각종 새로운 설비, 자재들의 적용으로 인해서 앞으로도 건설프로젝트 각 부문별로 다양하게 활용될 것으로 보인다. 이에 본 연구에서는 이러한 적시생산의 기법을 활용한 그동안의 사례들을 살펴보고, 이러한 사례들을 바탕으로 문제점 및 개선방안을 도출하여 자재의 생애주기(Life Cycle)을 고려한 현장 작업 흐름별 관리 포인트를 설정하여 적시생산 개념을 적용하는 연구를 수행하고자 한다. 현장의 활용가능성 및 적용을 통한 검증의 용이성, 또한 현장 내부의 양중 및 소운반에 대한 고려가 상대적으로 낮은 골조공사로 연구범위를 설정하여 콘크리트와 철근자재를 중심으로 연구를 진행하고자 한다. 이러한 골조공사에서의 적시생산(Just-In-Time) 개념 도입은 앞으로 커튼월, 가구공사, 창호공사, 철골 등의 부재로의 확대적용을 위한 방향성 제시를 함과 동시에 자재의 생애주기에 따른 정형화된 관리 운용 모델을 제시함으로서 건설공사의 최종적인 생산성 향상을 위한 도구로서 활용될 수 있음을 목적으로 한다.

Keywords