The Study of Quality Control in Engineering on the Turnkey Project(Focus on Change Orders at the Construction Phase)

턴키공사 설계품질관리에 관한 연구(시공단계의 설계변경을 중심으로)

  • 이용진 (경희대 대학원 건축공학과) ;
  • 이택운 (경희대 대학원 건축공학과) ;
  • 김진영 (경희대 대학원 건축공학과) ;
  • 한충희 (경희대 토목건축공학부 건축공학전공) ;
  • 김선국 (경희대 토목건축공학부 건축공학전공)
  • Published : 2001.09.01

Abstract

Turnkey project, also called Design-Build project, has been expanding and diversifying its business into the Korean market. However, it has been experiencing numerous difficulties due to a large number of change orders on the public turnkey project. Change order during the construction phase impact on time deliveries, budget and quality on a turnkey project. In preparation for this, the government has to improve the awarding procedure and general conditions for turnkey projects. Contractors should also cooperate with their co-working partners and establish a standardized procedure, which provides change order control for efficient implementation on the construction site.

본 연구는 턴키공사의 문제점 가운데 설계변경에 있어 부실한 설계관리가 상당한 비중을 차지하고 있음에 착안하여, 당초의 설계물이 시공단계에서 설계변경을 초래하게 하는 제도적 문제점을 찾아보고, 현행 책임감리제도하에서 시공자가 수행하는 현장설계변경 절차를 ISO에서 권고하는 절차와 비교하여 그 개선 방안을 알아보고자 하였다. 설계변경상에서 나타나는 문제점으로는 첫째, 시공단계의 설계변경은 원 설계조직이 기술적 타당성, 전반적 완전성, 품질요건 등 사업 전체적 시각으로 검토하는 절차수립 및 이행이 요구되었으며, 둘째로 효율적인 설계관리를 위해서 사업의 조직 및 분장업무, 기술표준의 결정, 설계문서별 작성기준 등 설계계획 단계에서의 개선이 필요하며, 마지막으로 공동도급업체간 설계품질관리체계를 구축하여 설계정보의 공유, 사전검토, 확인 등으로 설계오류를 최소화하는 것이다.

Keywords