Abstract
Currently, the load transfer's mechanism from a beam to a column has yet to ve clarified in a concrete filled steel tubular (CFT) structure with a connection type of an exterior diaphragm. The loads for each floor are transferred to the concrete core from a steel beam through ha contacted face between an in-filled concrete and the interior surface of a steel tube. Thus, a Push-Out test was performed to investigate the load transfer mechanism. A total of 30 samples were tested to confirm the bond stress and/or axial load distribution between a steel tube and in-filled concrete for CFT column. The main parameters considered for this study included concrete type, steel tube-shape/length, and the effect of a weld joint wit ha backing strip for a column splice. Test results were summarized to confirm load transfer behavior between a concrete and steel tube for each experimental parameter, using the analytical approach to verify experimental results.
콘크리트충전 강관기둥의 외다이아프램 접합부형식에서, 철골보의 하중이 내부의 콘크리트로 전달되는 하중전달 메카니즘이 아직 명확하게 규명되지 않았다. 여기서 각 층에서 철골보의 전단력은 외부의 강관과 내부의 콘크리트 사이의 부착응력에 의해 전달된다고 본다. 따라서 본 연구는 콘크리트충전 강관기둥의 부착응력을 파악하기 위해, 콘크리트면에만 하중을 가하는 단순가력실험을 실시하였다. 콘크리트 종류, 강관의 형상/길이, 이음부의 유무/뒷댐재의 두께 등을 변수로 총 30개의 실험체를 제작하여 실험을 실시했으며, 각 변수에 따른 실험결과를 비교/분석하고자 했다.