A Study on Development of Interlocking Inspection System for Electronic Interlocking System

전자연동장치의 연동검사시스템 개발

  • 박영수 (광운대학교 제어계측공학과) ;
  • 이기서 (광운대학교 정보제어공학과)
  • Published : 2002.06.01

Abstract

The purpose of interlocking system was to prevent the route for a train being set up and its protecting signal cleared if there was already another, conflicting route set up and the protecting signal for that route cleared. This paper proposed Interlocking Inspection System(IIS) consisting of interlocking simulator and field simulator to operate interlocking test of computer based Electronic Interlocking System(EIS) in this paper. Interlocking simulator consists of Design Edit System(DES), Logical Database Management Tool(LDMT) and real-time confirming system, field simulator is a equipment to simulate a control object of EIS and constitutes configuration operated in 19 inch standard rack. As a result of test to prove capacity of this IIS, the efficiency was shown as excellent. Therefore by using inspection system, we obtain every advantages. It has the functions for test data generation and automatic test execution based on personal computer. Time and cost for test work can be reduced more efficiently by using this developed inspection system

Keywords

References

  1. 石原俊次 외, 1996, '신형전자연동장치의 자동검사시스템' 철도와 전기기술, Vol.7, No.6
  2. 西堀 典幸, 1991, 전자연동장치 검사시스템개발, RTRI Vol.5, No.1
  3. 島添 敏之 외, 'PRIME 설계 검사지원 TOOL의 개발;' 철도와 전기기술
  4. 계전연동기 검사방법, JIS E 3004, 1993
  5. 渡辺俊勝, 秋田雄志, 1989, 전자연동장치의 개발-연동처리프로그램의 구성-, 철도기술연구소속보, No. A-86-116
  6. 연동장치 총합기능검사표준(예), 관서철도학원, 소화 59
  7. 신호설비 시공표준, 철도청, 2001
  8. 한국철도기술연구원, 1999, '전자연동시스템 검증을 위한 시뮬레이터 개발에 관한 연구.'
  9. 이재호 외 3인, 2000, '전자연동장치의 연동기법에 관한 연구', 2000 철도학회 학술발표집
  10. J. Waller, 'Railway Control Systems', 1993, A&C Black․London