A Vertical Movement Plan for Labors in High-Rise Building Construction Using Discrete-Event Simulation

이산형 시뮬레이션을 사용한 초고층건물공사 작업원의 수직이동계획

  • 안병주 (전주대 공학부 건축공학전공)
  • Published : 2004.04.01

Abstract

Recently, many high-rise buildings have been constructed, and are under construction. And a high-rise building with more than 100 floors is under planning. From site logistics management point of view, it is very important to manage vertical transportation of resource (e.g., material, equipment and construction labors) in high-rise building construction. The higher the building is constructed, the more important it is to manage for vertical transportation of it. In case of labors, vertical movement needs longer time in high-rise building construction than in low-rise. This results in low productivity and work efficiency of the construction. Therefore, this study presents a process of a vertical movement plan for labors using discrete-event simulation. And then the process applies to MT 130 project, which is a virtual high-rise building construction project.

최근 수년 동안에 국내에서는 많은 초고층건물들이 완공되었다. 지금도 다수의 초고층건물들이 시공되고 있으며, 심지어 100층 이상 규모의 초고층건물까지도 기획 중에 있다. 이러한 초고층건물공사의 현장관리 측면에서 중요성이 강조되는 관리항목들 중 하나는 시공 과정 중에 발생하는 자원의 수직이동을 관리하는 것이다. 특히 짓고자 하는 건물의 높이가 높아질수록 작업원들이 각자의 작업층으로 이동하는데 걸리는 시간은 길어지며, 자칫하면 이것이 현장의 작업능률과 생산성을 떨어뜨리는 원인이 될 수 있다. 이에 본 연구에서는 초고층건물공사 수행 시 작업원의 수직이동을 체계적으로 관리하기 위한 한 가지 방안으로서 이산형 시뮬레이션을 사용한 작업원의 수직이동계획 프로세스를 제안하였으며, 계획 프로젝트인 MT 130 타워공사를 대상으로 이것의 적정성을 검토하였다.

Keywords

References

  1. 신성우 (2002), '세계적인 한국적 초고층 건축을 세워야 할때다,' 건축, 대한건축학회지, 제46권 제8호, pp. 57-59
  2. 안병주, '초고층건물공사 마감자재의 수직.수평이동계획이 통합된 의사결정모델,' 박사학위논문, 한양대학교 대학원, 2001
  3. '마감공사의 TACT 공정계획 수립을 위한 생산성 조사/분석,' 한양대학교, 2002
  4. '한국무역회관 공사보고서,' 극동건설(주), 1988
  5. '초대형 고층 건물의 건축계획, 구조, 설비 및 시공기술 개발' 과제 중 '초대형 고층건물공사 현장 지원 시스템 개발에 관한 연구 보고서', 건설교통부, 1999
  6. Averill M. Law and W. David Kelton, 'Simlulation Modeling & Analysis 2nd Ed.,' Mc-Graw-Hill Internatinal Ed., 1991
  7. 김재련, '컴퓨터 시뮬레이션 개정판,' 박영사, 1995
  8. D. W. Halpin, 'An investigation of the use of simulation networks for modeling construction operations,' Ph. D. thesis, The Univ. of Illinois at Urbana-Champaign, IL, 1973
  9. Paulson, B. C. Jr. (1978), 'Interactive graphics for simulation construction operations,' J. Constr. Div., ASCE, Vol. 104, No. 1, pp. 69-76
  10. Chang, D., 'RESQUE,' Ph. D. thesis, The Univ. of Michigan, Ann Arbor, Mich., 1987
  11. Julio C. Martinez, 'STROBOSCOPE State and Resource Based Simulation of Construction Processes,' Ph. D. thesis, the Univ. of Michigan, Ann Arbor, Mich., 1996
  12. Sawhney, A., and AbouRizk, S. M. (1995), 'Simulation based planning method for construction project,' Journal of C.E.M., ASCE, Vol. 121, No. 3, pp. 297-303 https://doi.org/10.1061/(ASCE)0733-9364(1995)121:3(297)
  13. K.J. Kim and G. Edward Gibson Jr. (2003), 'Interactive simulation modeling for heavy construction operations,' Automation in Construction, December, ELSEVIER, pp. 97-109
  14. Photios G. Ioannou and Julio C. Martinez, (1996), 'Scalable simulation models for construction operations,' Proceedings of the 28th conference on winter simulation conference, Coronado, CA., pp. 1329-1336
  15. W. David Kelton, Randall P. Sadowski, and Deborah A. Sadowski, 'Simulation with Arena,' Mc-Graw-Hill Internatinal Ed., 1998